Installation Timeline

See how long Hanso Pergola installation takes — from delivery and scheduling to full completion on-site.

Updated over a week ago

Overview

Installation timing depends on the product type, delivery schedule, surface readiness, and whether you select DIY or White-Glove Installation. Below is the full breakdown so you know exactly what to expect.


🚚 Manufacturing & Delivery Lead Times

Product Type

Typical Lead Time

Notes

Pro+ Pergola

10–14 weeks

Standard and most popular lead time

Master+ Pergola

20–24 weeks

Custom production and higher complexity

Awnings

10–14 weeks

Based on selected size and configuration

Lead times include manufacturing and ocean/ground transit. Delays can occur during peak seasons or due to customs and weather.


📅 Scheduling Installation

Once your order ships, our team or installation partner will contact you to:

  • Confirm your delivery date and location

  • Ensure your surface is ready and level

  • Set your installation appointment window

If you purchased White-Glove Installation, coordination typically begins 1 week before delivery.


🧱 Installation Duration

White-Glove Installation:

  • Standard install: 1–2 days

  • Large or complex setups: 2–3 days

  • May vary depending on weather, surface, and electrical preparation

DIY Installation:

  • Typically 1–3 days with two people

  • Allow additional time for anchoring, accessories, or wiring


⚙️ After Installation

Once assembly is complete, the installer will:

  • Test the motorized louvers, LED lighting, and drainage system

  • Verify proper leveling and sealing

  • Remove packaging materials and perform a visual inspection

You’ll receive a brief walkthrough before sign-off to confirm everything functions correctly.


🕒 Common Causes of Delay

  • Surface not level or concrete footers not ready

  • Missing or delayed accessories (e.g., heaters, sunshades)

  • Rescheduling due to heavy rain or site inaccessibility

Your coordination team will stay in touch throughout to provide updated timelines.


📋 Typical Process Summary

Stage

Estimated Duration

Notes

Manufacturing & Shipping

10–24 weeks

Depending on product type

Delivery & Coordination

1 week before delivery

Hanso or partner contact

Installation (White-Glove)

1–2 days

Up to 3 for large pergolas

Electrical / Accessory Setup

Separate contractor

After installation