✅ Initial Inspection (24 Hours After Install)
Confirm all anchor bolts are torqued to spec.
Check louvers open/close smoothly without scraping.
Verify gutter outlets flow freely.
Ensure motor control box is sealed and elevated from water line.
📆 Routine Maintenance Schedule
Frequency | Task |
Every 6 Months | Retorque anchors & frame bolts |
Every 3 Months | Clean louvers & drain channels |
Annually | Re-seal silicone joints & repaint scratches |
🧰 What to Inspect
Baseplates → No movement when pushed.
Posts → Perfectly vertical (plumb within 2 mm).
Louvers → No obstruction or grinding.
Drain → No standing water after rain.
💡 Tip: Add this inspection to seasonal patio-cleaning routines.
⚠️ When to Contact Support
Visible frame shift > 5 mm.
Continuous motor strain or stopping mid-cycle.
Water leaking from beam seams (requires reseal).