Pro+ Pergola Post-Installation Safety & Inspection Guide

Safety checklist and maintenance guide after installing a Hansø Pro+ Pergola to verify alignment, stability, and drainage performance.

Updated over 2 weeks ago

✅ Initial Inspection (24 Hours After Install)

  • Confirm all anchor bolts are torqued to spec.

  • Check louvers open/close smoothly without scraping.

  • Verify gutter outlets flow freely.

  • Ensure motor control box is sealed and elevated from water line.


📆 Routine Maintenance Schedule

Frequency

Task

Every 6 Months

Retorque anchors & frame bolts

Every 3 Months

Clean louvers & drain channels

Annually

Re-seal silicone joints & repaint scratches


🧰 What to Inspect

  • Baseplates → No movement when pushed.

  • Posts → Perfectly vertical (plumb within 2 mm).

  • Louvers → No obstruction or grinding.

  • Drain → No standing water after rain.

💡 Tip: Add this inspection to seasonal patio-cleaning routines.


⚠️ When to Contact Support

  • Visible frame shift > 5 mm.

  • Continuous motor strain or stopping mid-cycle.

  • Water leaking from beam seams (requires reseal).