🧱 Surface Requirements
Tiles must be installed over a solid concrete base at least 4″ thick.
Do not mount over hollow tiles or adhesive-only installations.
⚙️ Step-by-Step Installation
1️⃣ Mark Anchor Points
Use your Outer-to-Outer Baseplate Measurement from the Pro+ model diagram.
Confirm that holes are centered on tile seams when possible.
2️⃣ Drill Anchor Holes
Use a diamond core bit to gently drill through tile glaze.
Continue with an M10–M12 masonry bit for concrete layer.
Minimum depth: 75 mm (3″).
3️⃣ Anchor Baseplates
Use stainless steel expansion bolts.
Insert rubber washers under baseplate to cushion tile surface.
Tighten gradually in a cross pattern to prevent tension cracks.
4️⃣ Seal & Finish
Apply clear silicone around bolt heads and tile edges.
Wipe excess to maintain aesthetics.
💡 Tip: Place masking tape on tile before drilling to prevent bit wander.