Use the installation manual that matches the number of tracks and glass panels supplied with your frameless sliding glass wall.
Choose your installation manual
What the manuals cover
Tools, parts identification, and component orientation.
Frame assembly, positioning, leveling, and fixing to the pergola.
Glass panel placement and roller adjustment.
Locks, limit blocks, stoppers, and side covers.
Silicone sealing and final operation checks.
Before installation
Read the full manual and check that the configuration matches the items received.
Inspect all packages and confirm the parts are complete. Keep the packaging until installation is successfully completed.
The manuals specify a minimum of three people for installation and two people to lift product parts from the packaging.
Use a protected surface and glass suction cups when handling the panels.
Prepare the required tools and silicone sealant; the manuals state that silicone sealant is not supplied.
If you are unsure which manual applies, contact Hanso Support at [email protected] with your order number and photos of the supplied tracks, panels, and labels.